Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/sites/radikls.co.uk/public_html/clients/connectstoragesystems.co.uk/wp-includes/functions.php on line 6114 Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/sites/radikls.co.uk/public_html/clients/connectstoragesystems.co.uk/wp-includes/functions.php on line 6114 Office Partitioning Poole, Mezzanine Floors Dorset, Storage Solution Suppliers

NRG Battery Specialists – Mezzanine Floor / Storage & Retail Outlet

Poole, Dorset

Works: Mezzanine floor; Office Partitioning & Retail Area

Contract dates: 2 Week programme. April 2015

NRG retail outlet storage solution in Poole, Dorset
NRG mezzanine floor Poole, Dorset

NRG Battery’s had been working from a small office a short walk from their new site and needed to be operating in a short space of time.

We were asked to design and install a complete turn key solution for NRG and were awarded contracts.

We installed a Mezzanine floor maximising overall space, using this space as light storage. We fitted offices and a retail area underneath. All electrical works were included along with suspended celiings and office partitioning. Alarm and Intruder System were fitted along with flooring and CCTV System for extra security, this allowed NRG to begin opening their new retail counter within scheduled timescales.

CSS are proud to have worked alongside NRG and the team and provided them with our services and expertise.

The work was undertaken within their time scale of 2 weeks and exceeded their expectations and deadlines.