Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/sites/radikls.co.uk/public_html/clients/connectstoragesystems.co.uk/wp-includes/functions.php on line 6114 Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/sites/radikls.co.uk/public_html/clients/connectstoragesystems.co.uk/wp-includes/functions.php on line 6114 Warehouse & Office Fit Out Devon, Mezzanine Floor, Pallet Racking & Shelving UK

 Tor Imports, Ashburton, Devon

Duration: 6 weeks

Brief: 100% space Utilisation, Double Skin Steel Partitioning, Mezzanine Floor Pallet Racking, Long Span Shelving, Mobile Shelving, Fork Lift Truck, Trolleys & Work Benches.

Tor Imports Warehouse & Office Fit Out Ashburton, Devon
Tor Imports Warehouse & Office Fit Out Ashburton, Devon

Tor Imports opened a brand new site. The new building is to service all product logistics and importations of top quality tobacco products.

Tor Imports were looking for a contractor who could offer a complete consultancy service with top quality products, on site contract management, professional installation and a complete long term sales service.

The project was awarded to Connect Storage Systems, and was completed mid 2008, as CSS met all Tor Imports criteria & work began in March 2008.

The design incorporated a heavy duty Mezzanine floor holding Mobile Shelving for consumable products and Archives. The first floor warehouse office fit out included carpeting, office furniture and all electrics to house the three warehouse staff.

The mezzanine floor included one hour fire rating and lighting.

A humidor was created on the ground floor using double skin steel partitions, fully insulated with adjustable long span shelving with open boarded planed decks to house tobacco products.

Adjustable high level Pallet Racking was installed on the ground floor to house some 150 pallets of miscellaneous bulk products and packaging.

Connect Storage Systems

Have an enquiry?

10 + 9 =

Customer Feedback

“Connect Storage Systems provided us with a pallet racking solution and mezzanine floors for our warehouse and the service was fantastic. Highly recommended!”

Mr C Griffiths